Open Menu Close Menu Open Search Close Search

Tufts’ earliest clean energy installation dates back to 1999 with 500 Watts of photovoltaics on Fairmont House, a small campus residence hall. Since then, Tufts has installed solar panels on residential and academic buildings across its Medford/Somerville campus. Through PowerOption’s Large Scale Solar program, two large ground-mounted photovoltaic systems were installed on the Grafton campus in 2017. In 2024, Tufts announced its participation in a first-of-its-kind aggregated renewable energy purchase that reduced energy-related emissions on the Boston health sciences campus by 40%.

Tufts funds solar installations in several ways: capital expenditure, grants, and Power Purchase Agreements (PPA)/Virtual Power Purchase Agreements (VPPA). PPA's and VPPA's are mechanisms that allow Tufts to support solar energy development on a larger scale while maximizing the impact of our funding and carbon emissions reduction. Watch our solar energy webinar to hear more about how we use these solar energy strategies at Tufts.

Keep reading to learn where each solar array at Tufts is located, when it was installed, how it was funded, and how much energy it produces.

 

Big Elm Virtual Power Purchase AgreementSolar field supported by Tufts

Using a procurement model known as a virtual power purchase agreement (VPPA), Tufts supported the creation of 20,000 megawatt hours of new solar energy in Texas – enough to power 1,800 homes a year. As a result of this project, Tufts reduced energy-related emissions on the Boston health sciences campus by 40%.

Year Installed: 2024

Funding: Virtual Power Purchase Agreement with Apex Clean Energy in collaboration with the Consortium for Climate Solutions, a first-of-its-kind group of higher education institutions, healthcare systems, nonprofit organizations, and a municipality in Cambridge and Boston, leveraging collective purchasing power to invest in renewable energy.

Power Produced: 7.6 MW (20,000 MWh annually)

Cummings School

Campus: Grafton

Year Installed: Construction for this project began in 2015. The panels were activated in 2017.

Funding: Power Purchase Agreement with Sun Edison (has since switched to NRG Energy)

Power Produced: 3,800 kW

Dowling Garage

Campus: Medford/Somerville

Year Installed: 2014

Funding: Power Purchase Agreement with SunBug Solar

Power Produced: 99 kW (125,000 kWh annually) Live data on energy generation from the Dowling
Garage can be seen here.

Roof of Tufts Gantcher Center covered with solar panels

Gantcher Center

Campus: Medford/Somerville

Year Installed: 2019

Funding: Power Purchase Agreement with Solect Energy

Power Produced: 340 kW (390,000 kWh annually)

Hodgdon Hall

Campus: Medford/Somerville

Year Installed: 2018

Funding: Grant funded by Tufts Green Fund ($6,500), Tufts University ($5,500), and SunBug Solar ($10,000)

Power Produced: 2700 kWh annually with 6 kWh of battery storage (enough to power 1,000 phones!). This is a Tufts Energy Group project that charges student electronic devices on the patio and common room.

Aerial view of Joyce Cummings Center rooftop solar

Joyce Cummings Center

Campus: Medford/Somerville

Year Installed: 2023

Funding: Power Purchase Agreement with Solect Energy

Power Produced: 89.8 kW (102,600 kWh annually)

Lewis Hall

Campus: Medford/Somerville

Year Installed: 2018

Funding: Power Purchase Agreement with Solect Energy

Power Produced: 83.2 kW (100,000 kWh annually)

Tsungming Tu Complex

Campus: Medford/Somerville

Year Installed: 2018

Funding: Power Purchase Agreement with Solect Energy

Power Produced: 52.36 kW (61,000 kWh annually)

Sophia Gordon Hall

Campus: Medford/Somerville

Year Installed: 2006

Funding: Grant funded by the Massachusetts Technology Collaborative ($500,000) with additional funds provided by Tufts.

Power Produced: 23.8 kW (25,000 kWh annually)
SoGo solar reduces approximately 17.7 Metric tons carbon dioxide equivalent emissions per year,
which is equal to 2 homes' energy use each year.
Calculated with the Greenhouse Gas Equivalencies
Calculator.

12 Bellevue St.

Campus: Medford/Somerville

Year Installed: 2019

Funding: $40,200 provided by donor

Power Produced: 12 kW DC (13,000 kWh annually)